Given a weighted undirected graph , a source vertex(s) and x distinct vertices as Delivery Location (d1 , d2 , d3 .. dx) assuming that each rider travels at 1m/s what is the min time required to complete all the deliveries if you have M drivers originating from the source simultainously , and also the path followed by them.

( it is guarented that reaching all delivery locations from the source vertex is possible )

input format -

n m s M                            //n vertices , m edges , s is the source vertex , M no of drivers

v11 v12 w1                         //vertices connected with weight w

v21 v22 w2

..

vm1 vm2 wm

x                            // no of delivery locations 1<= x < n

d1 , d2 , d3 , d4 .... dx               //delivery vertices (d[i] != s for all 1 <= i <= x)

output format - (M+1 lines first line should contain the min time required and all others M lines should include paths followed by drivers from 1 to M)

t               //min time to complete all deliveries

1->3->5               // path followed by first delivery guy

1->2->1->5               // path followed by second delivery guy

1->               path followed by third delivery guy (it may be possible that this delivery person didn't moved so his path finished at source only)

(all paths should start from source only)

  • Проголосовать: нравится
  • +21
  • Проголосовать: не нравится

»
5 лет назад, скрыть # |
 
Проголосовать: нравится 0 Проголосовать: не нравится

Seems like a pretty standard shortest path problem, where are you stuck at? what have you tried so far?

»
5 лет назад, скрыть # |
← Rev. 2  
Проголосовать: нравится +25 Проголосовать: не нравится

It's unclear whether after the delivery the delivery person has to go back to the source. If this is not the case, this problem is NP-hard as TSP can be reduced to this problem with M = 1 and x = n.

And, even if it is the case that the delivery person has to go back to the source after every delivery, the problem is still NP-hard because subset sum problem can be reduced to this problem with M = 2 and x = n (unless edge weight is polynomial in n).