can anyone give me any idea for this problem.
problem: Shil and Wave seqeunce
| # | User | Rating |
|---|---|---|
| 1 | Benq | 3676 |
| 2 | Kevin114514 | 3657 |
| 3 | jiangly | 3638 |
| 4 | turmax | 3442 |
| 5 | tourist | 3380 |
| 6 | Um_nik | 3353 |
| 7 | strapple | 3350 |
| 8 | squareOf105 | 3346 |
| 9 | heuristica | 3322 |
| 10 | maroonrk | 3310 |
| # | User | Contrib. |
|---|---|---|
| 1 | Qingyu | 158 |
| 2 | nik_exists | 151 |
| 3 | maspy | 150 |
| 4 | AmShZ | 144 |
| 4 | Um_nik | 144 |
| 6 | Errichto | 139 |
| 7 | adamant | 137 |
| 8 | BledDest | 135 |
| 9 | maroonrk | 133 |
| 10 | Proof_by_QED | 131 |
can anyone give me any idea for this problem.
problem: Shil and Wave seqeunce
| Name |
|---|



dp[i][0]=number of wave seq where a[i] is the last element and the one before him is lower(<)
dp[i][1]=number of wave seq where a[i] is the last element and the one before him is bigger(>)
Now to get the answer you maintain 2 BITs (for < and >).For every BIT you update for an element a[j] at position a[j] with dp[j][0](for the first BIT) and dp[j][1] (for second). To get the answer for dp[j][0] you query the second BIT(>) in interval [1,a[j]-1] and for dp[j][1] you query first BIT(<) in interval [a[j]+1,max_val].
Actually for a query,you want to link a[j] to all sequence from before that respect some conditions,that's why for dp[j][0] we want to link a[j] with an element smaller [1,a[j]-1] and that has been linked to a bigger element (we do query on BIT >).
Also take care that you have to add 1 to dp[j][0] and dp[j][1] as a[j] single can do a wave seq(in theory,for making sequences of length>1,you have to start with 1).
The answer is in the sum of all dp[i][0/1] — 1. Hope I helped.
thank you so much